CLICK HERE TO DOWNLOAD PPT ON ESP
ESP Presentation Transcript
1.ESP
2.NEED OF ESP
SYSTEMATIC DISPOSAL OF FINE ASH WHICH COULD HAVE ENTERED THE ATMOSPHERE AND SURROUNDINGS AND COULD HAVE MADE DUSTY ATMOSPHERE CAUSING INVISIBILITY & HEALTH HAZARDS.
POLLUTION CONTROL NORMS
SUSPENDED PARTICLES (150 mg / Nm3 )
SYSTEMATIC DISPOSAL OF FINE ASH WHICH COULD HAVE ENTERED THE ATMOSPHERE AND SURROUNDINGS AND COULD HAVE MADE DUSTY ATMOSPHERE CAUSING INVISIBILITY & HEALTH HAZARDS.
POLLUTION CONTROL NORMS
SUSPENDED PARTICLES (150 mg / Nm3 )
3.WORKING PRINCIPLE
IF HIGH VOLTAGE “DC” IS APPLIED BETWEEN TWO CONDUCTING ELEMENTS, THEN ELECTRICAL FIELD BECOMES STRONGEST NEAR THE –VE ELEMENTS, IT IS SO STRONG THAT ELECTRICAL DISCHARGE “THE CORONA DISCHARGE” DEVELOPS ATTACHED TO –VE ELECTRODE.
THE GAS IS IONISED IN THE CORONA DISCHARGE AND LARGE QUANTITIES OF +VE & -VE IONS ARE FORMED.
THE +VE IONS ARE IMMEDIATELY ATTRACTED TOWARDS THE –VE ELECTRODE.
THE –VE IONS HAVE TO CROSS THE ENTIRE SPACE BETWEEN THE ELECTRODES TO REACH +VE ELECTRODE.
DUST PARTICLES IN THE GAS ADHERE TO THE –VE IONS THUS THE PARTICLES BECOME –VELY CHARGED AND MIGRATE TOWARDS THE +VE ELECTRODE.
DEVELOPED ELECTRICAL FORCE > GRAVITATIONAL FORCE SO INSTEAD OF FALLING DOWN THE PARTICLES ARE ATTRACTED TO THE +VE ELECTRODE.
IF HIGH VOLTAGE “DC” IS APPLIED BETWEEN TWO CONDUCTING ELEMENTS, THEN ELECTRICAL FIELD BECOMES STRONGEST NEAR THE –VE ELEMENTS, IT IS SO STRONG THAT ELECTRICAL DISCHARGE “THE CORONA DISCHARGE” DEVELOPS ATTACHED TO –VE ELECTRODE.
THE GAS IS IONISED IN THE CORONA DISCHARGE AND LARGE QUANTITIES OF +VE & -VE IONS ARE FORMED.
THE +VE IONS ARE IMMEDIATELY ATTRACTED TOWARDS THE –VE ELECTRODE.
THE –VE IONS HAVE TO CROSS THE ENTIRE SPACE BETWEEN THE ELECTRODES TO REACH +VE ELECTRODE.
DUST PARTICLES IN THE GAS ADHERE TO THE –VE IONS THUS THE PARTICLES BECOME –VELY CHARGED AND MIGRATE TOWARDS THE +VE ELECTRODE.
DEVELOPED ELECTRICAL FORCE > GRAVITATIONAL FORCE SO INSTEAD OF FALLING DOWN THE PARTICLES ARE ATTRACTED TO THE +VE ELECTRODE.
4.With both the electrodes as plates:
5.ESP GROUPING
MECHANICAL SYSTEM
ELECTRICAL SYSTEM
MECHANICAL SYSTEM
ELECTRICAL SYSTEM
6.ESP DESIGN DATA
7. MECHANICAL
CASING
HOPPERS
GAS DISTRIBUTION SYSTEM
COLLECTING SYSTEM
EMITTING (DISCHARGE) SYSTEM
RAPPING MECHANISM
STAIRWAY & GALLERIES
CASING
HOPPERS
GAS DISTRIBUTION SYSTEM
COLLECTING SYSTEM
EMITTING (DISCHARGE) SYSTEM
RAPPING MECHANISM
STAIRWAY & GALLERIES
8. ELECTRICAL
TRANSFORMER RECTIFIER
(RECTIFORMER)
ELECTRONIC CONTROLLERS
AUXILIARY CONTROL PANELS
SAFETY INTERLOCKS
FIELD EQUIPMENT & DEVICES
TRANSFORMER RECTIFIER
(RECTIFORMER)
ELECTRONIC CONTROLLERS
AUXILIARY CONTROL PANELS
SAFETY INTERLOCKS
FIELD EQUIPMENT & DEVICES
9.CASING
WELDED CONSTUCTION CONSISTING PRE-FABRICATED WALLS
INSPECTION DOORS ON SIDES AND MAN HOLES AT TOP IS PROVIDED
CASING RESTS ON ROLLER SUPPORTS TO ALLOW FOR FREE THERMAL EXPANSION
GALLERIES & STAIRWAYS ARE PROVIDED ON THE SIDES FOR EASY ACCESS TO EQIPMENTS, INSPECTION DOORS ETC.
WALKWAY INSIDE EP FOR INSPEC TION.
WELDED CONSTUCTION CONSISTING PRE-FABRICATED WALLS
INSPECTION DOORS ON SIDES AND MAN HOLES AT TOP IS PROVIDED
CASING RESTS ON ROLLER SUPPORTS TO ALLOW FOR FREE THERMAL EXPANSION
GALLERIES & STAIRWAYS ARE PROVIDED ON THE SIDES FOR EASY ACCESS TO EQIPMENTS, INSPECTION DOORS ETC.
WALKWAY INSIDE EP FOR INSPEC TION.
10. HOPPER
THESE ARE SIZED ADEQUATELY TO HOLD 24 HOUR COLLECTION
BAFFLES IN EACH HOPPERS TO AVOID CLOGGING OF ASH.
INSPECTION DOOR
THERMOSTATICALLY CONTROLLED HEATING ELEMENTS.
THESE ARE SIZED ADEQUATELY TO HOLD 24 HOUR COLLECTION
BAFFLES IN EACH HOPPERS TO AVOID CLOGGING OF ASH.
INSPECTION DOOR
THERMOSTATICALLY CONTROLLED HEATING ELEMENTS.
11. GAS DISTRIBUTION BAFFLES
GAS EXPANDS 10 FOLDS AFTER ENTERING THE ESP
GUIDE VANES, SPLITTERS, SCREENS ARE PROVIDED IN THE INLET FUNNEL TO DIRECT THE FLUE GAS EVENLY OVER THE ENTIRE CROSS SECTION.
GOOD PERFORMANCE OF ESP DEPENDS ON EVEN DISTRIBUTION OF GAS
GAS EXPANDS 10 FOLDS AFTER ENTERING THE ESP
GUIDE VANES, SPLITTERS, SCREENS ARE PROVIDED IN THE INLET FUNNEL TO DIRECT THE FLUE GAS EVENLY OVER THE ENTIRE CROSS SECTION.
GOOD PERFORMANCE OF ESP DEPENDS ON EVEN DISTRIBUTION OF GAS
12. COLLECTING ELECTRODE
13. COLLECTING ELECTRODE SYSTEM
14.EMITTING ELECTRODE
15. EMITTING ELECTRODE SYSTEM
16.RAPPING DRIVING MECHANISM
GEARED MOTOR : 0.37KW, 415 VOLTS 1400 RPM
FINAL RPM : 1.1
LOCATION : BOTH SIDES OF CASING
QUANTITY : 12 NOS EACH FOR EE & CE
GEARED MOTOR : 0.37KW, 415 VOLTS 1400 RPM
FINAL RPM : 1.1
LOCATION : BOTH SIDES OF CASING
QUANTITY : 12 NOS EACH FOR EE & CE
17.INSULATORS
SHAFT INSULATORS
SUPPORT INSULATORS
BUSHING INSULATORS
SHAFT INSULATORS
SUPPORT INSULATORS
BUSHING INSULATORS
18. INSPECTION
INSPECTION WINDOW/DOOR
MAN HOLE
INSPECTION WINDOW/DOOR
MAN HOLE
19.HEATERS
20. MAINTENANCE & PRECAUTIONS
PROPER ISOLATION WITH CASTLE KEY INTERLOCKS
PROPER IDENTIFICATION OF FIELDS
PROPER EARTHING BEFORE WORK
PROPER ISOLATION WITH CASTLE KEY INTERLOCKS
PROPER IDENTIFICATION OF FIELDS
PROPER EARTHING BEFORE WORK
21. INTERCONNECTION OF FIELDS
IN CASE IF THERE IS FAULT ON RECTIFORMER OR POWER SOURCE TO THE FIELD.
ADAJACENT FIELD IS CONNECTED PARALLEL TO THE REQUIRED FIELD
IN CASE IF THERE IS FAULT ON RECTIFORMER OR POWER SOURCE TO THE FIELD.
ADAJACENT FIELD IS CONNECTED PARALLEL TO THE REQUIRED FIELD